Concrete Calculator
The concrete calculator above gives the cubic yards of material a slab, footing or pad requires. Enter length, width and depth in feet and the tool converts the volume to cubic yards, which is the unit ready-mix suppliers quote and bill. The guide below explains the formula, the waste allowance and the costs a material estimate does not include.
Key facts
- Slab volume formula: length × width × depth in feet, divided by 27, equals cubic yards.
- Order 8 to 10 percent more than the calculated figure to cover spillage and uneven subgrade.
- Residential driveways in Greater New Orleans typically require 5 inches of concrete, one inch more than the standard 4-inch practice on stable subgrade.
- Ready-mix concrete in the Greater New Orleans area runs $155 to $195 per cubic yard delivered in 2026.
- Short-load fees apply to orders under 3 cubic yards and typically add $75 to $150 to the invoice.
How Does the Concrete Calculation Work?
The calculator uses one formula: length in feet multiplied by width in feet multiplied by depth in feet, divided by 27. The divisor 27 converts cubic feet to cubic yards, because one cubic yard equals 27 cubic feet.
What Does a Worked Example Look Like?
A driveway that is 16 feet wide, 40 feet long and 5 inches deep (0.417 feet) works out as follows: 16 × 40 × 0.417 = 266.9 cubic feet. Divide 266.9 by 27 and the result is 9.88 cubic yards. Round up to 10 cubic yards before applying the waste allowance.
Convert inches to feet before multiplying. Divide the inch measurement by 12. A 4-inch slab is 0.333 feet. A 5-inch slab is 0.417 feet. A 6-inch slab is 0.5 feet. Using inches directly in the formula produces a figure 12 times too small.
How Much Extra Concrete Should You Order?
Add 8 to 10 percent to the calculated cubic yardage on every pour. That allowance covers three predictable losses: spillage during the pour, subgrade that is slightly lower than the target depth across the full slab area, and over-excavation at the edges where the perimeter often digs wider than planned.
On the 10-cubic-yard driveway above, a 10 percent allowance adds 1 cubic yard, bringing the order to 11 cubic yards. Running short mid-pour is a serious problem. A cold joint forms where fresh concrete meets partially set material, and that joint is a permanent weak plane where cracking and water infiltration begin. Ordering a partial extra yard after the truck leaves costs a second delivery fee plus the short-load charge. Order the full amount at the start.
What Thickness Does Each Job Require?
Thickness is determined by the load the slab carries, not by preference. The values below reflect common practice in the trade. Anything structural, including slabs supporting walls or equipment, requires an engineer's specification, not a rule of thumb.
- Foot traffic only (sidewalks, patios): 4 inches over compacted base is standard practice on stable ground.
- Passenger vehicles (residential driveways): 4 inches is the national rule of thumb, but 5 inches is typical practice in Greater New Orleans because the soft alluvial clay and organic silt common across Orleans, Jefferson and St. Tammany parishes compress under load and reduce effective bearing capacity.
- Light commercial and heavy SUVs or pickups: 5 to 6 inches with reinforcement.
- Heavy vehicles, forklifts, loaded delivery trucks: 6 inches minimum, rebar or fiber reinforcement, and in most cases an engineer's review before the pour.
Confirm thickness requirements for any permitted project with the relevant parish building department before finalizing the design.
What Do Concrete Materials Cost in 2026?
Ready-mix concrete delivered in the Greater New Orleans area runs $155 to $195 per cubic yard in 2026. The range moves with the mix design, the admixtures specified and the distance from the batch plant to the site. A 3500 PSI mix sits toward the lower end of that range. A 4000 PSI mix with air entrainment or fiber reinforcement moves toward the higher end.
The cost most people miss is the short-load fee. Ready-mix plants set a minimum load, typically 3 cubic yards. An order below that minimum draws a fee of $75 to $150 on top of the per-yard price. A footing that calculates to 1.8 cubic yards does not cost 1.8 times the per-yard rate. It costs 1.8 yards of material plus the short-load charge. Factor that into any small-pour budget.
What Mistakes Make the Calculator Return the Wrong Number?
The four most common calculation errors each cause the tool to return a figure that does not match the actual pour.
- Measuring the excavation instead of the finished slab. The slab is smaller than the hole. Use the finished slab dimensions.
- Forgetting the thickened edge. Driveways and slabs-on-grade often have a perimeter footing 8 to 12 inches deep. That extra volume adds 10 to 20 percent to the total on a typical residential driveway and is not captured by a flat-depth calculation.
- Ignoring drainage fall. A patio with a 1-inch-per-8-foot slope across a 16-foot width has a depth that varies by 2 inches from one side to the other. Use the average depth, not the minimum.
- Ordering to the exact calculated figure with no waste allowance. See the 8 to 10 percent rule above.
The calculator gives a reliable material estimate based on the dimensions entered. An installed price depends on subgrade condition, reinforcement, finish, demolition of existing concrete and access to the site. A site visit produces that number.
Common questions
- How do I convert inches to feet for the concrete formula?
- Divide the inch measurement by 12. A 4-inch slab is 0.333 feet, a 5-inch slab is 0.417 feet, and a 6-inch slab is 0.5 feet. Using the inch value directly in the formula produces a result 12 times smaller than the actual volume needed.
- How many cubic yards does a 20x20 foot patio need?
- A 20-by-20-foot patio at 4 inches deep requires 5.93 cubic yards. The calculation is 20 × 20 × 0.333 divided by 27. Add 10 percent for waste, bringing the order to 6.5 cubic yards. Round up to a whole yard when placing the order with the ready-mix supplier.
- Why do I need more concrete than the calculator shows?
- The calculated figure is the theoretical volume of a perfect rectangle. Real pours lose material to spillage, subgrade that is slightly lower than planned across the full area, and over-excavation at the slab edges. An 8 to 10 percent overage covers those losses and avoids a cold joint from running short mid-pour.
- What is a short-load fee for concrete?
- A short-load fee is a charge applied when a ready-mix order falls below the plant's minimum load, typically 3 cubic yards. The fee runs $75 to $150 in the Greater New Orleans area and is added on top of the per-cubic-yard material price. Small footings and repair pours are the most common situations where this cost appears.
- Does soft ground in New Orleans require a thicker slab?
- Yes. The soft alluvial clay and organic silt common across Orleans, Jefferson and St. Tammany parishes compress under repeated load, which reduces effective bearing capacity. Residential driveways here are typically poured at 5 inches rather than the 4-inch standard used on stable subgrade. Confirm the specification for any structural slab with a licensed engineer or the relevant parish building department.
- How accurate is the concrete calculator for a footing?
- The calculator is accurate for any rectangular volume, including footings, provided the correct dimensions are entered. Enter the footing length, width and depth in feet. For multiple footings, calculate each one separately and add the totals. Remember that orders under 3 cubic yards draw a short-load fee of $75 to $150 from most ready-mix suppliers.
Last updated August 5, 2026
Get a free estimate
Tell us what you need and where. An estimator walks the site, measures, and leaves you a written number. The visit takes 20 to 30 minutes and costs nothing.
- Free on-site measurement and written estimate
- Serving New Orleans and surrounding parishes within 40 miles
- Residential and commercial work